Narrow houses, small services
Much of Riverdale, Leslieville, Cabbagetown and Corktown was built between the 1880s and the 1920s: narrow semis and row houses, often with the panel squeezed under the basement stairs. Many still have a 60 amp service, or a 100 amp panel crowded with tandem breakers and circuits added one at a time over the decades. That is not enough for a renovated kitchen, central air, a basement suite or an EV, and it is often the first thing an insurer or home inspector flags. Shared walls and tight basements also limit where a new panel can go, so we plan the location as part of the job.
Converted houses and multiple units
A lot of houses between Broadview and Coxwell have been split into two or three units at some point. Those conversions can leave behind a confusing mix of meters, sub-panels and circuits that cross between apartments. When we upgrade a multi-unit house, we make sure each unit has its own properly sized panel, any shared areas like hallways and laundry are on their own circuits, and the total service can carry everything at once. If you are planning a new basement suite, a laneway suite or a garden suite, this is the time to plan its feed too.
What the upgrade involves
Every job starts with a load calculation, so the new service is sized to the house and your plans rather than guessed. A panel replacement keeps the existing service and is usually done in a day. A service upgrade to 200 amps replaces the service entrance and meter base and is scheduled around a Toronto Hydro disconnect and reconnect. We trace and label every circuit, add arc-fault and ground-fault protection where the code requires it, and leave a clear, typed directory. All panel and service work is done under an Electrical Safety Authority (ESA) permit and inspected.
How a panel upgrade goes
- Text us photos. The panel with its door open, the meter, and a note about what you are planning.
- Load calculation. We check the service, the panel and every circuit, and recommend the right size.
- Booking. Panel swaps are booked directly; service upgrades are timed with Toronto Hydro.
- Install and inspect. New panel in, circuits tested and labelled, and the job inspected.