Why east end houses get rewired
Most rewires we do start with a renovation, an insurance request, or a house that has run out of circuits. Victorian and Edwardian row houses often still have original runs behind the plaster, sometimes spliced into newer cable in the attic or basement.
Ways to approach it
- Floor by floor. Useful when you are renovating one level at a time, or living in the house during the work.
- Kitchen and laundry first. The heaviest loads get new dedicated circuits, which ends most nuisance tripping.
- Whole house. Every circuit replaced and grounded, usually paired with a panel upgrade.
Narrow houses take planning
With no side access and a shared wall on one or both sides, cable routes are limited. We plan runs through the basement ceiling, stud bays and the attic, and keep openings small and in places that are easy to patch. In lofts and converted buildings we work with exposed conduit where the building calls for it.
The process
- Survey. What is live now, where it runs and what the panel can take.
- Written scope. Rooms, circuits and patching agreed before work starts.
- Permit and rewire. Filed with the Electrical Safety Authority, then installed.
- Inspection. ESA inspects and you get a labelled panel directory.